Showing posts with label Nuclear Waste. Show all posts
Showing posts with label Nuclear Waste. Show all posts

Tuesday, October 19, 2021

Native American Civilization Bites the Nuclear Dust at White Mesa, Utah - 2011

 


Sign for the White Mesa Uranium Mill and processing plant near Blanding, Utah - Click for larger image (http://jamesmcgillis.com)

Native American Civilization Bites the Nuclear Dust at White Mesa, Utah

The settlement of White Mesa, Utah is located twelve miles south of Blanding, Utah on U.S. Highway 191. As the Utah component of the Ute Mountain Ute Reservation, its 2000 census data indicated a population of 277 people. Over ninety-eight percent of the population was Native American. By the 2010 census, the population at White Mesa had fallen over twelve percent to 242 people. By then, the population had aged, with fewer children and young people living there. In 2000, over fifty percent of the population lived below the poverty line. The only retail business at White Mesa is the reservation-owned White Mesa Travel Center, which includes as gas station and convenience store.

A dubious landmark in San Juan County, Utah, the Denison Mines White Mesa Mill sits on 3840 acres of nuclear-contaminated land - Click for larger image (http://jamesmcgillis.com)About halfway between White Mesa and Blanding, Utah, sits the Denison Mines White Mesa Mill.
First opened in 1980 by Energy Fuels Corporation, White Mesa Mill went bankrupt in 1997. At that time, International Uranium (USA) Corp. purchased the mill. Later, Denison Mines purchased the mill and now operates it as a wholly owned subsidiary. The White Mesa Mill has the distinction of being the only conventional uranium ore-processing mill in the United States. Unobtrusive, when viewed from the highway, the facility covers 3840 acres of land. In addition to the mill itself are huge earthworks and retention ponds. In 2002, The Canyon Country Zephyr named the White Mesa Mill its “#1 Secret Place of Canyon Country”.

Currently, the mill accepts radioactive and toxic wastes from around the nation, and then stores them onsite. When the gathered stockpiles of nuclear tailings and residues are sufficient, the mill goes into operation and processes them. With the addition of newly mined ores, the mill has seen continuous operation since 2005. Since there is no rail access to the mill, all materials arrive at the site by truck. When you are sitting at an open-air café in Moab, Utah watching huge multi-axel tractor-trailer rigs roll through town, they may be loaded with nuclear contaminated materials destined for White Mesa. It is interesting that those huge, covered trailers display no hazardous or nuclear placards.

Safety record sign at entrance to White Mesa Uranium Mill, near Blanding, Utah - Click for larger image (http://jamesmcgillis.com)Although the processing plant has a separate vanadium-processing loop, the main product of the White Mesa Mill is triuranium octoxide (U3O8), which is a compound of uranium. Despite its olive green color, U3O8 is a form of yellowcake, which may contain up to eighty percent uranium oxide. Triuranium octoxide manufactured at White Mesa Mill is transported offsite for further enrichment. Its ultimate use is as fuel for nuclear power plants. With further enrichment, it could become weapons-grade material.

In May 2008, the Division of Air Quality (DAQ), within the Utah Division of Environmental Quality conducted an inspection and issued a report regarding air quality compliance at White Mesa Mill. Among other things, the DAQ inspection looked at how much ten-micron particulate matter (PM10) went up the stacks and into the atmosphere. Although permitted for up to .4 pounds of PM10 per hour, during inspection each yellowcake scrubber/dryer onsite emitted “only” .12 pounds per hour. If operated continuously for one year, those two dryer/scrubbers alone would emit over one ton of unknown, possibly radioactive particulates into the air. Other sources claim that the mill annually emits 62 tons of sulfur dioxide, 109 tons of nitrogen oxides, and 254 tons of particulates. Propane usage onsite is several million gallons per year.

Radioactive warning sign at Denison Mines Corp. White Mesa Mill - Click for larger image (http://jamesmcgillis.com)Also discovered during the 2008 inspection was a non-compliant baghouse (air filtration facility) associated with lab operations at the site. After notification of non-compliance, Denison Mines estimated that the baghouse emitted
one hundred ten pounds of PM10 particulates per year. Although there was no corroboration of those estimates, the Utah DAQ did not challenge company findings. Because of the supposedly small amount of released particulates, the DAQ did not fine Denison Mines for non-compliance.

After thirty years of operation, much of the mill’s original equipment is still in use, or disuse, as the case may be. For example, the 2008 DAQ inspection determined that the emergency electrical generator onsite had last operated in 1996. Despite the requirement that an emergency generator be available during power interruptions, DAQ did not fine Denison Mines for lack of compliance. Ironically, the DAQ inspection report used inoperability as a reason to not penalize the operator. In the inspection report, there is no mention of the need to fix or replace the derelict emergency generator. Under the circumstances, we can only hope that future power interruptions will not result in site contamination or release of airborne particulates.

Visible smoke issues from two stacks at the White Mesa Uranium Mill near Blanding, Utah - Click for larger image (http://jamesmcgillis.com)Also missing, misplaced or misidentified during the inspection was a Bartlett-Snow rotary calciner. The DAQ report indicated, “Company contacts were not aware of where the rotary calciner and control equipment were located.” That surprised me, since a rotary calciner shown at the Bartlett-Snow website required a three-axel flatbed trailer to carry it. I checked eBay, and as of this writing, the only used rotary calciner listed there carried a price of $35,000. If I were interested in that unit, I would bring a dosimeter with me during the inspection.

If you Google “White Mesa Uranium Mill”, you will find a host of articles decrying large-scale trucking of nuclear waste to the mill, as well as its spotty environmental record. In 2008, the Utah DAQ found missing, inoperable and unpermitted equipment at the mill. In their final report, DAQ’s lack of urgency and enforcement reminded me of lax oversight at the Fukushima-Daiichi nuclear power plant prior to March 2011. When the tsunami flooded all of the emergency generators at the plant, a cascade of failures began, leading to a nuclear fuel meltdown on May 13, 2011.

The Ute Mountain Ute Tribe owns the White Mesa Travel Center and convenience store, twelve miles south of Blanding, Utah - Click for larger image (http://jamesmcgillis.com)The Denison Mines White Mesa Mill is not in danger of a nuclear meltdown. The yellowcake produced there is not fissionable. Still, in its final recommendations for their next inspection, the Utah DAQ report suggested in typical understated fashion, “Bring a respirator – It may be needed in certain areas of the facility”.

On June 3, 2011, I rolled up the front gate at White Mesa Mill, which appeared to be in full operation. Visible smoke issued from two large exhaust stacks on the east side of the mill. Although the 2008 DAQ report indicated that no single source of particulates at the mill should exceed twenty percent opacity, to me the visible smoke completely obscured the blue sky beyond it. Admittedly, I did not have proper optical measuring equipment that day. Still, a simple webcam pointing at the stacks from a position that shows a solid background should solve that problem. If asked, I would be happy to supply a free webcam system to the Utah DAQ. With the installation of a solid black “billboard” behind each stack, DAQ compliance officers could remotely monitor the opacity of released particulates. If the mill were in compliance, Denison Mines could use the calibrated webcam images to prove it.

Dust storm, including material from the White Mesa Uranium Mill envelopes the White Mesa Travel Center near Blanding, Utah - Click for larger image (http://jamesmcgillis.com)Finally, what shall become of the poorest, least represented and closest proximity residents to the White Mesa Mill? If trends identified in the 2000 and 2010 census prevail, the Ute Mountain Ute Reservation at White Mesa will continue its decline. Once a thriving settlement that featured paved roads, utilities and framed houses, the neighborhood at White Mesa is now derelict and decaying. A quick drive through “town” shows many abandoned homes. With six square miles of nuclear and chemical waste nearby, the resale market for property at White Mesa, let alone Blanding, Utah is fading like the smoke from White Mesa Mill.

Since the dry climate in Southeastern Utah slows decay, these relics of Native American culture might well be standing at White Mesa one thousand years from now. What will future archeologists think when they discover an abandoned ruin near an abandoned uranium mill and a large pile of nuclear contaminated waste?

Email James McGillisEmail James McGillis

 


By James McGillis at 05:00 PM | Environment | Comments (0) | Link

Monday, October 11, 2021

Cleanup of UMTRA Moab Nuclear Site is Now On Flood-Watch - 2011

 


View of the Colorado River, with UMTRA nuclear cleanup site at lower left - Click for map of UMTRA site (http://jamesmcgillis.com) 

Cleanup of UMTRA Moab Nuclear Site is Now On Flood-Watch 

During the Cold War years, the UMTRA project languished for lack of sufficient funding.
 
During heavy rain, the Moab Wash channels water toward the Moab Pile and the Colorado River. An aerial photo on the current UMTRA website shows the wash running toward the site. Both then and now, a subterranean stream passes under the site. As it does so, it carries hazardous materials to the Colorado River. Today, pumps near the river lift much of that contaminated water to the surface. Sprinklers then distribute it across the tailings, where it evaporates into the atmosphere.
 
By 2006, new studies showed a high potential for massive flooding along the Upper Colorado River. What had previously been called a ‘1000-year flood’ might occur once in 300 years. The new 300-year flood might also be three The Moab Pile in April 2009. Click for image one year later (http://jamesmcgillis.com)times larger than the old 1000-year flood. Sediments from ancient floods along the river proved that a large spring flood could sweep much of the Moab Pile downstream. If so, its radioactive poisons would flow toward the Lower Colorado Basin. Suddenly, the prospect of Los Angeles and Phoenix becoming “ghost cities” seemed plausible.
 
During the George W. Bush administration, cleanup funds for the Moab Pile were sparse. At the time, the U.S. was fighting wars in both Iraq and Afghanistan. Unwilling to add further to the federal deficit, many Cold War era cleanups languished. Conventional wisdom said, “If a large flood is so rare, the odds are that it will not happen here in our lifetimes.” 
 
Soon after President Obama took office, his administration funded cleanup of the Moab Pile. Then, as the economy faltered, the project received additional federal stimulus money. In April 2009, the first trainload of contaminated soil departed for a disposal site near Crescent Junction, Utah. By late 2010, larger waste containers and a second train each day promised even faster removal of the Moab Pile.
Nuclear waste container staging area at the Moab Pile - Click for larger image (http://jamesmcgillis) 
In 2025, when UMTRA concludes its work, the long-running environmental disaster known as the Moab Pile will be gone. With almost fifteen years to go, I wonder what might happen if a 300-year flood hits the site prior to complete removal.  When asked that question, an UMTRA manager explained to me that flood protection at the site was already complete. Most of that work focused on sandbagging where the Moab Wash meets the river on the northern edge of the Moab Pile. As a temporary stopgap, workers had sandbagged to protect the well field adjacent to the Colorado River. That small project protected against a normal spring flood, but would do nothing to stop the potential ravages of a 300-year flood event.
 
Once the removal and transport work began, conventional wisdom reestablished itself. The current prevailing attitude at the UMTRA project is that, ‘If we don't think about it, everything will be OK’. Removal and disposal of material continues, but will that effort ‘beat the clock’ against a 300-year flood event? Statistically, there is a five percent chance that a 300-year flood event will occur before UMTRA concludes. Even so, federal regulators and the private contractor continue to ignore the potential for flood damage at the UMTRA site.
Empty nuclear waste container being moved at UMTRA site, Moab, Utah - Click for larger image (http://jamesmcgillis.com) 
In recent years, large dust storms have become common occurrences in the Four Corners. The prospect of a regional dust storm rapidly melting heavy snowpack on the Colorado Plateau is real. In preparation for such an event, both UMTRA and its regulators should reassess the risk of flood damage at the site. A one-in-twenty chance that a flood will send any part of the Moab Pile downstream is too high a risk to take. The livelihood of fourteen million downstream residents may depend on protecting the Moab Pile during its removal.
Email James McGillisEmail James McGillis
 
 

By James McGillis at 12:49 PM | Environment | Comments (0) | Link